A Conso Electrical is the manufacturer to produce 10kv to 35kv ONAN power distribution transformer, dry type power distribution transformer, pad mounted transformer, box type substation, sf6 full insulated gas cell,sf6 gas insulated loading breaker panel and vacuum circuit breaker. The company located in the Yueqing Central industry Park, Yueqing City, Zhejiang Province, China.
A Cnoso Electrical producing as the standard of IEC 60076 or above.
A Conso electrical has the ISO CCC,CNAS and CQC certification.
Moreover, if the regular clients has special, the company can apply new certification to meet the needs.
A yes, we do. We will need the drawings and the technical requirement document from clients.
A 1. 15 to 25 days for 1 to 15 piece 10kv distribution transformer
2.30 to 60 days for large capacity 35kv power transformer
3.15 to 35 days for 10kv compact substation and pad mounted transformer
4.15 to 20 days for 1 to 60 piece 10kv vacuum circuit breaker
A first we need the drawing or the technical requirement document from clients to design
Of course, it needs 3 to 5 days to design a power distribution transformer or a compact substation.
A we accept 30% advance payment, 70% before cargoes shipping.
In the terms of L/C, T/T, D/P, D/A, Western Union and MoneyGram