Conso Electrical Science and Technology Co., Ltd was founded in 2006 with a primary focus on producing premium 11kv 400v 440v Compact Substation. Our core strengths lie in the manufacturing of distribution transformers, Electrical Switchgear, and Compact Substations. Our unwavering commitment is to provide superior products at competitive prices and cultivate enduring relationships with our esteemed clientele.
The 11kv 400v 440v Compact Substation is a highly efficient and space-saving solution designed for medium-voltage electrical distribution systems. This compact substation integrates essential components, offering a comprehensive package for safe and reliable power distribution in a compact footprint.
Item |
Unit |
Value |
||
HV |
LV |
Transformer |
||
Rated Voltage |
KV |
12 |
0.4 |
12/.04 |
Rated Current |
A |
125 |
2000 |
|
Rated Frequency |
Hz |
50/60 |
||
Rated Capacity |
KVA |
|
|
≤1600 |
Rated Short-time Power Frequency Withstand Voltage |
KV |
42 |
2.5 |
35 |
Rated Lightning Impulse Withstand Voltage |
KV |
75 |
8 |
75 |
Rated Short Circuit Drop-out Current |
KA |
31.5 |
|
|
Rated Short Circuit Closing Current |
KA |
80 |
|
|
Rated Peak Withstand Current(Ground loop) |
KA |
31.5 |
||
2S Rated Short-time Withstand Current(Ground loop) |
KA |
12.5 |
||
Protection Degree |
|
IP54 |
Container Shell
|
Steel Shell
|
Laminate Shell
|
Compact Shell in Process |
Switchgear is Testing |
Daily Clean Up |
Workshop Overview |
KYN28 in Process |
HXGN12 in Process |
GCS in Process |
GIS in process |
Switchgear Assembled with the Shell
1.Are spare parts Ready to Available on 11kv 400v 440v Compact Substation?
A: Conso Electrical has an warehouse to storage regular accessory components, such as MCB, AC contactor, and thermal reply. if the clients has the requirement, spare part will arrive to Conso Electric about 3 to 7 days.
2.Would you tell me the leading time for one piece of 11kv 400v 440v Compact Substation ?
A: of coure, my friend, it needs 2 weeks to produce one piece 11kv 400v 440v Compact Substation.
3.What is the MOQ to the order of 11kv 400v 440v Compact Substation ?
A: Conso Electrical accepts the order even it is one price of 11kv 400v 440v Compact Substation.
4.What is the Maximum Production Capacity to 11kv 400v 440v Compact Substation ?
A : Conso Electrical could produce 20 piece 11kv 400v 440v Compact Substation in 30 days.
5.What is the Warranty Period to a 11kv 400v 440v Compact Substation ?
A: For 11kv 400v 440v Compact Substation, the Warranty Period is 12 months start from the product put into operation.