Home > Products > Electrical Transformer > Distribution Transformer > 500kva 33 0.415 Kv Distribution Transformer
500kva 33 0.415 Kv Distribution Transformer
  • 500kva 33 0.415 Kv Distribution Transformer500kva 33 0.415 Kv Distribution Transformer
  • 500kva 33 0.415 Kv Distribution Transformer500kva 33 0.415 Kv Distribution Transformer

500kva 33 0.415 Kv Distribution Transformer

Conso Electrical Science and Technology Co., Ltd is a professional manufacture, which has the production line of 10 to 35 kv distribution transformer, pad mounted substation, gas insulation switchgear and vacuum circuit breaker. To supply a outstanding 500kva 33 0.415 kv distribution transformer, Conso Electrical executes management procedure as ISO9001 standard system, moreover, each 500kva 33 0.415 kv distribution transformer produced fit the IEC60076 or the above. To cut the material costs, Conso electrical also has created advanced solution for clients since 2006. Partners from various domains are encouraged to visit our company and explore partnership opportunities.

Send Inquiry

Product Description

Video



The 500kva 33 0.415 kv distribution transformer Annual Maintenance Procedures:


For the annual inspection, component maintenance and cleaning are the key focus:

1.Use soft cotton to clean the 500kva 33 0.415 kv distribution transformer bushings.

2.Annual inspection of OLTC (On-Load Tap Changer) is crucial. Ensure moisture levels and dielectric properties are at the appropriate levels for efficient operation. (Observe oil condition and sample moisture content (PPM) and dielectric strength (BDV). Low BDV and high PPM levels indicate the need for oil replacement.)

3.Tighten all connections of control and relay circuits at least once a year. Additionally, check if the indicator heaters are at standard spacing and performing as required. Clean the marshalling box at least once a year. (The marshalling box should be cleaned. Indicator heaters should also be checked in conjunction with the space functions.)

4.Clean control switches, alarm devices, and relays along with their circuits using the specified cleaning agents.

5.Check the operation of your news release equipment.

6.Check the oil levels on indicators and ensure they contain the required oil volume for operation.

7.Measure the resistance rating of ground connections and risers. Do this by measuring ground resistance with a ground resistance tester.

 

The 500kva 33 0.415 kv distribution transformer Technical Data:


Rated Capacity:

500 kVA;

Mode:

S11-M-500 or according to requirements;

Primary Voltage:

33kV;

Secondary Voltage:

415V;

No Loading Loss:

680±10% W;

Loading Loss:

6516±10% W;

Impedance:

6.5%±10%;

Tapping Method:

online tapping or offline tapping

Cooling method:

ONAN;

Altitude:

less than 1000m above the sea level.


CONSO·CN the 500kva 33 0.415 kv distribution transformer Detail:


Oil Filled
Oil Emptied
Amorphous Alloy
Rolled Iron Core


CONSO·CN the 500kva 33 0.415 kv distribution transformer Workshop:


Winding Workshop

Coil Drying Area

Oil Filling Area

Finished Product Area


the 500kva 33 0.415 kv distribution transformer Testing Center:



the 500kva 33 0.415 kv distribution transformer Producing Equipment:


Transformer Oven

Casting Equipment

Foil winding machine


CONSO·CN the 500kva 33 0.415 kv distribution transformer Ready to Ship:



Package method:


Wooden Box

Steel Structure



Hot Tags: 500kva 33 0.415 Kv Distribution Transformer, China, Manufacturers, Factory, Suppliers, Price, Cost
Related Category
Send Inquiry
Please Feel free to give your inquiry in the form below. We will reply you in 24 hours.
X
We use cookies to offer you a better browsing experience, analyze site traffic and personalize content. By using this site, you agree to our use of cookies. Privacy Policy
Reject Accept