To produce an exceptional 33kv 12 12.5 mva 3 phase power transformer, Conso Electrical Technology and Science Co., Ltd will start from the step of power transformer designing, until to a 33kv 12 12.5 mva 3 phase power transformer ready to ship. The engineer take about 5 days to offer the cost effective solution according to requirement of clients. Meanwhile, each steps of production process will be inspected to provide a smooth user experience to clients. The product will suffer a more serious non destructive testing test, especially to oversea clients.
1.Safety First: When conducting 33kv 12 12.5 mva 3 phase power transformer maintenance, ensuring personnel safety is paramount. Adhere to relevant operating procedures and safety measures to prevent accidents.
2.Professional Personnel: Its maintenance should be carried out by trained professionals with the requisite knowledge and experience. They can accurately assess the transformer's operational status and issues, taking appropriate measures.
3.Regular Maintenance: Its maintenance should follow a predefined schedule to ensure that maintenance is conducted regularly. Adhering to the schedule helps prevent failures resulting from neglecting maintenance.
4.Record Management: Detailed records of the 33kv 12 12.5 mva 3 phase power transformer maintenance process and outcomes should be maintained. This includes maintenance dates, activities performed, test results, etc., for later analysis and reference.
5.Emergency Preparedness: During maintenance, be prepared for emergencies. This includes having the necessary repair tools and spare parts on hand, as well as contact information for repair services.
Rated Capacity: | 12500 kva or 12.5 mva; |
Mode: | S11-M-12500 or depends; |
Voltage Ratio: | 33/10 kV, 33/11 kV, 33/15 kV,etc; |
No loading loss: | 10 kW±15% or depends; |
loading loss: | 53.8 kW±15% or depends; |
Impedance: | 4.5% ± 15%; |
Short Circuit Current: | ≤0.30%; |
Vector Group: | YNd11; |
Cooling method: | ONAN or ONAF; |
Transformer Winding:
Transformer in Application:
Winding Workshop |
Coil Drying Area |
Oil Filling Area |
Finished Product Area |
Transformer Oven |
Casting Equipment |
Foil winding machine |
Wooden Box |
Steel Structure |